5 Mistakes That Delay Your SORA Application | EU Drone Port
EU Drone Port EU Drone Port
⏱️ Free SORA Mistakes Guide

5 mistakes that add months to your SORA
and how to avoid every one of them

A SORA application takes 3-9 months in the best case. These 5 mistakes routinely add 3-6 months on top. EU Drone Port has seen all of them across hundreds of applications in 31 countries.

3-question SORA application risk check

Answer honestly. These three questions identify the most common causes of SORA rejection and delay before you submit.

Question 1 of 3 · CONOPS quality

Is your CONOPS based on your actual planned operation, or adapted from another project?

Select the option that best describes your current CONOPS

Question 2 of 3 · SAIL calculation

Have you calculated your SAIL level using the SORA v2.0 methodology?

Select the option that best describes your SAIL status

Question 3 of 3 · CAA pre-screening

Have you pre-screened the application with your target CAA before submitting?

Select the option that best describes your CAA engagement

Your SORA application risk level

Risk assessment

Review the 5 mistakes before submitting

Download the free guide for the full corrective action plan for each mistake, plus the SORA pre-submission checklist.

What adds months to every application

EU Drone Port has coordinated over 5,000 authorizations across 31 countries. These 5 mistakes account for the majority of delays and rejections we have seen.

M1

Mistake 1: CONOPS Written for a Different Operation

Adapting a CONOPS from a previous application or a template without rewriting for your specific operation. CAAs can identify template text. This triggers requests for clarification that add 2-3 months.

M2

Mistake 2: Wrong SAIL Level

Underestimating SAIL level means insufficient OSOs (Operational Safety Objectives). Overestimating means unnecessary mitigation burden. Both cause CAA rejection or rework.

M3

Mistake 3: Ignoring Ground Risk Class

SORA has both air risk (SAIL) and ground risk (GRC). Operators often focus on air risk and underspecify ground risk mitigation for population density below the flight path. CAAs always check both.

M4

Mistake 4: No Pre-screening Contact with the CAA

Submitting a SORA cold without pre-screening the application with the CAA. Pre-screening meetings identify CAA-specific concerns before you invest weeks in writing. EU Drone Port always pre-screens.

M5

Mistake 5: Incomplete Robustness Evidence

Selecting OSOs without providing evidence for each. 'We have a maintenance plan' is not evidence. CAAs want actual maintenance records, pilot training logs, and equipment test reports.

The SORA timeline reality

The EASA SORA timeline assumes a clean, well-prepared application submitted to an available CAA. In practice, CAAs are backlogged, pre-screening takes 4-8 weeks to arrange, and any one of these 5 mistakes can reset the clock. EU Drone Port's record across 31 countries: 80% of applications approved without a rejection when pre-screened.

The free SORA mistakes guide

All 5 mistakes explained with regulatory context
Corrective action for each
SORA pre-submission checklist
How EU Drone Port structures SORA applications
Country-specific CAA preferences
Not a guarantee of approval: CAA decision is sovereign
⏱️

Get the Free SORA Mistakes Guide

Avoid the 5 mistakes that add months and cost thousands to your SORA.

Your subscription could not be saved. Please try again.
🎉 Check your inbox! Your SORA guide is on its way.

🔒 No spam, ever. Unsubscribe anytime.
By submitting you agree to receive emails from EU Drone Port.

Need SORA consulting?

Contact ops@eudroneport.com →

From first SORA to every flight

EU Drone Port manages the full lifecycle: SORA consulting, flight coordination, and STS operations manual preparation. All in one place, across all 31 countries.

🔧

Flight Coordination

Per-flight management

Once your SORA is approved, EU Drone Port coordinates airspace authorisation and logistics for each individual flight across all 31 EASA countries.

  • Airspace authorisation per flight
  • NOTAM coordination
  • CAA liaison if required
  • All 31 EASA member states
€95 + VAT
Per flight
Book a Flight →
📄

STS Operations Manual

For STS-01 and STS-02

Not ready for SORA? STS may be the right route. EU Drone Port prepares complete STS operations manuals for STS-01 and STS-02 operations.

  • Covers all 5 common manual mistakes
  • GPS scope and emergency procedures
  • Pilot qualification section
  • CAA submission ready
From €450 + VAT
Custom quote based on operation scope
Get a Quote →

Questions about SORA applications

How long does a SORA take with EU Drone Port?

EU Drone Port targets 3 to 6 months from engagement to approval for a well-scoped SORA, depending on the CAA and SAIL level. Pre-screening with the CAA typically adds 4 to 8 weeks to preparation but significantly reduces the risk of rejection. Our record: 80% of applications approved without a rejection when pre-screened with the target CAA before submission.

What is SAIL and how is it calculated?

SAIL (Specific Assurance and Integrity Level) is a 6-level scale (I to VI) derived from the SORA methodology. It is calculated by combining the intrinsic ground risk class (GRC) and the air risk class (ARC), then applying mitigations. The SAIL level determines which Operational Safety Objectives (OSOs) apply and at what robustness level. EU Drone Port calculates SAIL using the SORA v2.0 methodology for every engagement.

Can I start with a PDRA and switch to SORA later?

Yes. PDRAs (Predefined Risk Assessments) are pre-approved templates for common operations. If your operation fits a PDRA scenario, it is faster and simpler than a full SORA. If your operation is more complex, a SORA is the appropriate route. EU Drone Port advises on the right route during initial scoping and can manage both PDRA applications and full SORA submissions.

Does EU Drone Port handle CAA communications?

Yes. EU Drone Port manages all CAA communications as part of its SORA consulting service, including pre-screening meetings, submission, response to clarification requests, and liaison during the assessment period. We have established relationships with CAAs across all 31 EASA member states.

What is Ground Risk Class?

Ground Risk Class (GRC) is one of the two risk dimensions in the SORA methodology. It assesses the risk to people on the ground below the flight path, based on the drone characteristics (size, kinetic energy) and the population density of the overflown area. CAAs check GRC documentation carefully. Many operators focus only on air risk and underspecify their ground risk mitigation, which is Mistake 3 in this guide.

Is SORA valid in all 31 EASA countries?

SORA is the EASA-endorsed methodology for Specific Category risk assessment, and it applies across all 31 EASA member states. However, each CAA has discretion in how it evaluates SORA submissions, the level of detail expected, and the turnaround time. EU Drone Port tracks CAA-specific preferences and applies them to every submission.

How much does a SORA cost end-to-end?

SORA costs depend heavily on the complexity of the operation, the SAIL level, and the CAA involved. EU Drone Port provides a custom quote after an initial scoping call. Contact ops@eudroneport.com with your operation description to receive a quote. As a reference, simpler SORA applications (SAIL II to III) are significantly less costly than complex multi-site BVLOS applications at SAIL V to VI.

Avoid the 5 mistakes that add months to your SORA. Free guide + pre-submission checklist.

Used by 5,000+ operators across 31 countries to prepare cleaner SORA applications.

⏱️ Get the Free SORA Guide
5,000+ Authorizations coordinated
5 Costly mistakes
80% Approval rate first submission
31 Countries