Free BVLOS guide

How to fly BVLOS beyond 2 km under SORA

STS-02 allows BVLOS up to 2 km from the pilot with airspace observers. Corridor inspections, long-range mapping and deliveries go further. For those you need a PDRA that fits or a SORA-based authorisation. This guide shows what the authority will look at. If your operation needs one, our team prepares the full SORA operational authorisation and deals with the authority for you.

98% approval rate · Approvals in 28 of 31 EASA countries · Documentation ready in 30 days

BVLOS routes

Which approval covers your BVLOS flight

Start with the simplest route that covers the operation and move up only when you need to.

RouteBVLOS rangeKey conditions
STS-02Up to 1 km, or 2 km with airspace observersC6 drone, controlled ground area, sparsely populated environment
PDRA-S02Up to 1 km, or 2 km with airspace observersSimilar to STS-02 for drones without a class label
PDRA-G01 to G03Depends on the PDRASparsely populated areas, airspace observers, reserved airspace or low height
SORADefined by your risk assessmentAny operation outside the above

Conditions summarised from Regulation (EU) 2019/947 and EASA AMC. Check the full conditions before applying.

Command and control link

Show the C2 link covers the full route with enough performance, and what the drone does on link loss.

Air risk

Define the airspace along the route and how you reduce the risk of meeting manned aircraft, from reserved airspace to detect and avoid.

Ground risk along the route

Population density changes along a corridor. Assess every segment, not just the take-off area.

Containment

Prove the drone stays inside the operational volume, and protect the adjacent area if it does not.

Crew and procedures

Remote crew training, handover procedures and emergency response must match the length and complexity of the flight.

The drone itself

Technical evidence for reliability, flight termination and navigation accuracy grows with the SAIL.

BVLOS is about airspace first

Most long-range BVLOS approvals depend on how you manage air risk. Talk to the air navigation service provider early.

What you’ll get

The free BVLOS SORA guide

⚡

Get the Free BVLOS SORA Guide

How to get approval for flights beyond 2 km.

Your subscription could not be saved. Please try again.
Check your inbox! Your guide is on its way.

No spam, ever. Unsubscribe anytime.
By submitting you agree to receive emails from EU Drone Port.

Ready to apply?

See the SORA service →

EU Drone Port authorisation services

From risk assessment to approval

EU Drone Port prepares SORA and PDRA applications and supports you with the authority until approval.

PDRA Authorisation

We prepare the full PDRA application, submit it with you and answer the inspector until the authorisation is granted.

From €1,950 + VAT

Flight Coordination

Send us date, time, coordinates, drone and pilot. We handle the airspace coordination until you have clearance, including in restricted zones.

€95 per flight + VAT, billed monthly

FAQ

Questions about BVLOS drone operations

No. The open category requires visual line of sight. BVLOS needs a standard scenario declaration, a PDRA or a SORA-based authorisation.

Up to 1 km from the remote pilot, or up to 2 km with airspace observers, with a C6 drone over a controlled ground area in a sparsely populated environment.

An operational authorisation based on a PDRA that covers the operation or on a full SORA, including evidence for C2 link, air risk, ground risk and containment.

It depends on the air risk. In reserved or low-risk airspace other mitigations may be enough. Higher air risk requires stronger tactical mitigations.

Usually several months, depending on the authority and the complexity of the airspace. Early contact with the air navigation service provider helps.

Yes. We prepare, submit and defend BVLOS SORA applications from €2,950 + VAT, with approvals in 28 of 31 EASA countries.

Last updated: October 2026. Source: Regulation (EU) 2019/947, EASA AMC and GM to the regulation, and JARUS SORA.

Fly beyond 2 km. Free BVLOS guide.

What the authority looks at and how to prepare.

98%

Approval rate

28 of 31

EASA countries with approvals

30 days

Documentation ready

€2,950 + VAT

SORA from