BLOG POSTS
Even with the correct approval route, airspace and stakeholder coordination can delay flights.
Plan coordination early when operating near controlled airspace, aerodromes, special use airspace, critical infrastructure, or sensitive sites.
Because the manual often does not match the real ConOps, or it lacks evidence: training records, checklists, maintenance control, or coordination procedures.
No. STS may simplify the approval route, but coordination requirements can still apply depending on airspace and local constraints.
When approvals and documentation cycles are slowing down the business model or the mission program, and you need repeatability across sites and teams.